Frequently Asked Questions

  • How does your architectural design process work?

    Every project starts by understanding what you want to achieve—not by defaulting to a standard plan. Goals, budget, timeline, and how your space connects to surrounding rooms are all reviewed before a line is drawn. The design then works backward from your vision to find the best solution for your specific site and conditions.

  • What's the difference between an ADU and a home addition?

    An ADU is a self-contained living unit—attached or detached—with its own utility and egress requirements separate from the primary home. A home addition expands your existing square footage as part of the main structure. That distinction changes nearly every technical requirement in the design and permitting process.

  • Do I need an architect for a home remodel permit in Washington?

    Any project involving structural work, new square footage, or utility changes typically requires drawings stamped by a licensed architect or engineer for permit submission in Washington State. Most remodels, additions, and ADUs trigger that requirement—minor cosmetic work is one of the few exceptions.

  • What happens if there's unpermitted work on my home?

    Unpermitted work must be documented and permitted before it becomes part of your home's legal record—a problem that surfaces during sales, refinancing, or new remodels. An architect evaluates what was actually built, produces accurate as-built drawings, and submits them for permit review and approval so the work is fully legalized.

  • What's the biggest mistake homeowners make with kitchen remodels?

    Starting the design with aesthetics before mapping existing plumbing and electrical. The position of a drain stack, electrical panel, or gas line quietly controls what layouts are actually buildable. Designing around those constraints from the start prevents costly surprises when the contractor opens the walls.

  • How do I know if my lot can support a home addition?

    A site evaluation examines setbacks, existing lot coverage, utility locations, and structural connection points before design begins. These conditions determine what can be built and where on your property. Skipping this step frequently leads to expensive redesigns once real constraints surface mid-project.

  • What does a commercial space evaluation cover before I sign a lease?

    It examines whether your intended layout fits within the structural grid, whether existing mechanical and electrical systems can support your operations, and where plumbing is positioned relative to your needs. The result tells you what the space can support as-is and what requires landlord negotiation or tenant improvement investment before you commit.

  • What makes a good kitchen layout for a family that cooks frequently?

    Clear sightlines and adequate landing space near the range are priorities, along with a workflow that avoids crossing traffic paths between the refrigerator, sink, and cooking area. How the kitchen connects to adjacent dining and living areas also determines whether the layout supports the way the space actually gets used day to day.

  • How does the garage or basement conversion design process work?

    It begins by reviewing the existing structural layout, mechanical systems, and egress conditions before the design is drawn. Bedroom conversions carry specific egress window, ceiling height, and fire-separation requirements that must be resolved in the permit drawings. Designing through those conditions upfront keeps the permit from stalling at the city counter.

  • What does a free evaluation include for a remodel or addition project?

    The evaluation reviews your goals, property constraints, existing utility locations, and budget to determine what's feasible before design work begins. It establishes whether proposed changes—adding square footage, converting a space, or redesigning a kitchen—are realistic given your site conditions. At Ebersole Architecture & Design, every project starts with this step.